IS-Compliant Instruments
Every instrument meets the relevant IS code, with test certificates supplied.
NABL-Linked Calibration
Calibration by NABL-accredited labs, with due-date tracking and reminders.
Install + Training
Commissioning at your site lab plus hands-on training for technicians.
AMC & Spares
Annual maintenance with NCR-wide service network and genuine spares.
Lab Builder
Choose your test scope — see the lab we'd set up
Each scope adds a bench bay and its floor machines. Hover a marker for the instruments in that bay.
Scope
Concrete
Aggregate
Cement
Soil
NDT
Instruments
15
Floor area
≈ 490 ft²
Commissioned
3 weeks
Instrument list
1Compression testing machine, 2000 kN
IS 516
1Cube moulds 150 mm (set of 12)
IS 10086
1Slump cone & tamping rod
IS 1199
1Curing tank, temperature-controlled
IS 516
1Flow table
IS 1199
2Motorised sieve shaker + IS sieves
IS 2386 (Pt 1)
2Los Angeles abrasion machine
IS 2386 (Pt 4)
2Aggregate impact tester
IS 2386 (Pt 4)
2Digital balance, 0.1 g
IS 2386
2Flakiness & elongation gauges
IS 2386 (Pt 1)
3Vicat apparatus
IS 4031 (Pt 4/5)
3Le Chatelier moulds
IS 4031 (Pt 3)
3Mortar mixer
IS 4031 (Pt 6)
3Humidity cabinet
IS 4031
3Blaine air permeability
IS 4031 (Pt 2)
Test Simulator
Run the tests your site lab will run every day
Pick a test, set the grade, and press run. The report fills in sample by sample and checks each result against the IS acceptance limit.
Cube strength
Slump
Rebound hammer
Grade
M20
M25
M30
M35
7 day
28 day
Equipment
Concrete, aggregate, cement & soil — sab covered
IS-compliant instruments with calibration certificates, installed and commissioned at your site lab.
All8
Concrete3
Aggregate2
Cement1
Soil1
Ndt1
CONCRETE
01
Compression Testing Machine
Cube and cylinder strength testing, digital or dial.
1000–3000 kN · IS 516
Get quote →
CONCRETE
02
Slump & Workability Kit
Slump cone, tamping rod, base plate, and flow table.
IS 1199
Get quote →
CONCRETE
03
Cube Moulds & Curing Tank
Cast iron moulds with digital temperature-controlled tank.
150 mm · IS 516
Get quote →
AGGREGATE
04
Sieve Shaker & Sieves
Motorized gradation analysis for coarse and fine aggregates.
IS 383 / IS 2386
Get quote →
AGGREGATE
05
Impact & Abrasion Testers
Aggregate impact value and Los Angeles abrasion machines.
IS 2386 (Part 4)
Get quote →
CEMENT
06
Vicat & Le Chatelier Kits
Setting time, consistency, and soundness of cement.
IS 4031
Get quote →
SOIL
07
Soil Testing Suite
Proctor, CBR, tri-axial, and field density equipment.
IS 2720
Get quote →
NDT
08
Rebound Hammer & UPV
Non-destructive strength checks on hardened structures.
IS 13311
Get quote →
Calibration & Service
NABL-ready from day one
01
Lab layout & instrument list
We design the site lab to your project's QA plan and NABL scope.
02
Calibration certificates on install
Every instrument commissioned with valid calibration traceability.
03
Technician training included
Your team trained on procedures, logs, and report formats.
04
48-hour service response
Breakdown support across Delhi NCR with loaner instruments.
Calibration register
Every instrument, every due date
All
Due
Valid
7 instruments · 1 overdue · 2 due in 30 days — we book recalibration before it lapses.
InstrumentNext dueStatus
Vicat apparatus
CEMENT · every 12 months
09 Oct 2026 · 4 d overdue
Digital balance, 0.1 g
AGGREGATE · every 12 months
22 Oct 2026 · 9 d left
Hot-air oven
SOIL · every 12 months
08 Nov 2026 · 26 d left
Compression testing machine
CONCRETE · every 12 months
23 Nov 2026 · 41 d left
Rebound hammer
NDT · every 6 months
13 Dec 2026 · 61 d left
Curing tank thermostat
CONCRETE · every 6 months
08 Feb 2027 · 118 d left
IS sieve set
AGGREGATE · every 12 months
04 May 2027 · 203 d left
Sample register for a typical concrete site lab. Intervals vary by instrument and your NABL scope; we schedule recalibration before the due date.
How to get it
Kharido, rent lo, ya poora lab setup karao
BUY
Purchase
Own the instruments outright with warranty and first-year calibration.
Warranty + calibration included
Get quote →
RENT
Rent
Monthly rental for project-duration labs — maintenance included.
Min. 3 months
Get quote →
TURNKEY
Most chosen
Full Lab Setup
Complete NABL-ready site lab: instruments, furniture, training, AMC.
Commissioned in 2–3 weeks
Get quote →
Site lab set karna hai?
Instrument list, layout, and commercial quote — within the hour.
Lab setup quote
Single instrument ya full NABL-ready lab — quote within the hour.